topolino
Well-known member
On the home straight at last. Main fairings, nose cone, tank and seat unit fitted. What an utter PIA it was to get the side fairings on without the small tank grommets and rear mid-fairing grommets engaging on the pins without them popping out. Must have tried about ten times before I finally got them to go on correctly. Next up is the battery cover panel and lowers. I have both a split lower fairing and a one piece painted bellypan. The latter will get fitted after the bike's first service/oil change. Once it's all back together it's going off to get the paint correction done (any minor swirl marks and flaws removed), then an Xpel film kit fitted. Lastly the Media module needs to be activated, Akra map and any software updates installed and an MOT (despite the fact it's never been ridden and has only 12 PDI miles on the clock). As promised I will upload a video and pics as soon as I get some free time, which is not something I am blessed with right now, so please bear with me.